DJI Mavic 3 Enterprise Series UAS support - TBC supports the import and processing of photogrammetry data collected with the DJI Mavic 3 Enterprise Series model M3E UAS using TBC's simple but powerful aerial photogrammetry workflow.Then you can import the file using the TBC import dialog or with the drag-and-drop method. If a newer version is available (for example, version 1), you can download it by clicking the Manual button in the Internet Download pane and logging in the IGS website using your own personal login. Note: TBC automatically downloads the first version (version 0) of the applicable IGS20 precise orbit data file. IGS20 reference frame support - TBC supports the latest IGS20 reference frame for using precise orbits when processing baselines.To view context-sensitive help at any time while using TBC, press F1. The Pile Plan Exporter for DPS/Groundworks exported the incorrect pile plan, e.g., Pile Plan A was selected, but Pile Plan B was exported.Following are the new features included in this version of Trimble Business Center. The sort by column function did not work in the Points to Surface command. In some scenarios (e.g., calculating volumes between OG with Topsoil Stripped and FD with Topsoil Absent surfaces), an exception was encountered when running the Earthwork Summary command. Imported data sets that did not include high-precision GNSS or GCPs could result in blurred deliverables. Importing DJI M3E data could cause an error to occur in TBC.(TBC has been enhanced to read all XMP tag types, including those that are nonconforming.) TBC was not able to read the senseFly XMP tag for high-precision GNSS, causing GNSS quality to be set to low. The Phantom 4 RTK antenna type name was incorrectly assigned to imported DJI P1 and DJI M3E raw receiver data, even though the correct antenna type was used for baseline processing, possibly causing user confusion. The import of aerial photogrammetry data could fail because TBC was unable to identify the correctimporter to use. The Best Fit Line command could not be used with point cloud data. An error could occur after using the Best Fit Line command to create a line and then recomputing or closing and opening the project. An error could occur when using the Change Elevation command to change the elevation of a reference surface.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |